All underground services and secondaries shall be furnished and installed by the developer or owner in accordance with all applicable codes except that the minimum depth shall not be less than 24 inches below final grade. All underground material installed by the developer or owner shall be inspected by the State of Tennessee Electrical Inspector prior to backfilling.
The developer or owner shall consult with CDE prior to construction to determine the point of connection to the underground service. For underground services which originate from overhead distribution facilities, all risers must be installed up the pole to a point no farther away than 18 inches from the CDE system neutral. All conduits must be installed on stand-off brackets or unistrut and must all be installed on one side of the pole.
CDE will furnish and install the material to make the connections from the underground service to the distribution facilities.